FM-3-81 Maneuver Enhancement Brigade Download

Page 117 of 188

Synchronize and Coordinate Protection 09 November 2021 FM 3-81 A-17 Table A-3. Protection integration to MDMP Key Input Steps Protection Actions Protection Output Key Output Higher HQ plan or order New mission anticipated by the commander Step 1: Receipt of Mission Warning Order Consolidate protection-related running estimates from staffs Review consolidated protection array of assets Determine protection working group members Ensure protection planner integration within the unit planning team Protection working group Warning and reporting systems Protection running estimate Commander’s initial guidance Initial allocation of time Higher HQ plan or order Higher HQ knowledge and intelligence products Knowledge products from other organizations Design concept (if developed) Step 2: Mission Analysis Warning Order Provide input on critical networks or nodes that can be influenced Identify requests for information Determine available assets Conduct and consolidate initial assessments Conduct protection working group Recommend and coordinate information collection assets for protection Identify EEFI, and establish how long it should be protected (Condition of key units and weapons systems) Determine OPSEC indicators Develop essential survivability and other engineering tasks Identify available information on routes and key facilities Analyze protection considerations of civilians in the AOs Determine available unified action partner capabilities Determine funding sources, as required Determine availability of construction and other engineering materials Consolidated HVT list RFIs Initial assessments Recommended PPL Recommended EEFI Initial protection priorities Input into information collection plan Problem statement Mission statement Initial commander’s intent Initial planning guidance Initial CCIRs and EEFIs Initial OPSEC planning guidance Updated IPB and running estimates Assumptions