ATP-5-0-2-1 Staff Reference Guide Volume 1 Download

Page 208 of 440

Appendix B 192 ATP 5-0.2-1 07 December 2020 Figure B-2. Example of a battalion engagement area PRIORITIES OF WORK B-54. Priorities of work are determined in accordance with METT-TC. In addition to a task name, priorities of work include a given time for performance, a measurable performance standard to guide the accomplishment of each task, and a designation for whether the work will be controlled in a centralized or decentralized manner. Priorities of work may include, but are not limited to, the following tasks: Continuous security. Withdrawal plan. Continuous communication. Mission preparation and planning. Weapons and equipment maintenance. Water resupply. Resupply. Mess plan. Sanitation and personal hygiene. Alert plan and "stand to." Rest and sleep plan.