Chapter 2 100 ATP 5-0.2-1 07 December 2020 When placing time phase lines (assuming that time-consuming planning, issuance of orders, reconnaissance, and logistical preparations may occur during movement), consider only the time— Required to adopt movement formations. To conduct movement to the selected location. For the unit to close after arrival. During COA analysis of the SITEMPs against potential friendly COAs, update time phase lines to consider when threat movement may be triggered or how the threat might be influenced by friendly actions. Note. Analysts may need to reach out to outside organizations such as the National Ground Intelligence Center to attain accurate and up-to-date doctrinal rates. ATP 2-01.3 Figure 2-27. Situation template example Threat COA Statement 2-302. Every threat COA includes a threat COA SITEMP and a threat COA statement, which is a narrative that describes the SITEMP. Figure 2-28 illustrates a threat COA statement.