ATP-3-09-12 Field Artillery Counterfire and Weapons Locating Radar Operations Download

Page 41 of 150

Employment Considerations for Weapons Locating Radars 26 October 2021 ATP 3-09.12 4-3 WEAPONS LOCATING RADAR EMPLOYMENT 4-11. The primary method of specifying WLR coverage and movement for the WLR section is the RDO. Higher HQ may also develop a radar execution matrix based off localized standard operating procedures as a planning tool for managing multiple WLRs. Both methods provide the required information for conducting WLR operations. However, the primary method for orienting WLRs is digitally using the AFATDS RDOs. POSITIONING 4-12. The operations and counterfire officers determine the general positioning areas for WLRs. The radar section chief selects the final radar site based on radar position analysis system and visual sighting. During the MDMP, planners need to factor in the proximity of WLRs to adhere to separation requirements. The tactical situation will determine if there is a need for site improvement. LSCO may require frequent repositioning of the WLR and the ability to march-order and displace quickly. 4-13. The radar section chief coordinates site improvement or hardening directly with supporting engineers or contracted support. Site improvement normally includes survivability of the WLR, safety, and line of site. The engineer unit improves the position or constructs berms to enhance the survivability of the WLR and section and egress routes. For an example of how to berm the AN/TPQ-53 see appendix H. The antenna should be bermed to the height of the antenna trailer. This provides protection for antenna transceiver group (ATG) electronics while providing a clear line of sight for the antenna. The engineer unit clears obstructions to provide a clear line of site. Limited resources, and the requirement to march-order and displace quickly may preclude the requirement for long term site improvement. 4-14. Safety for friendly forces in the vicinity of the WLR is a major concern during the planning and implementation process. The heat and radiation generated by the WLR poses a personnel hazard. These hazards are minimized by positioning the WLR a safe distance from friendly forces. Elevating the antenna above the level of personnel and vehicles can mitigate the clutter and radiation hazard. RADAR TASKING PROCEDURES 4-15. The DA Form 5957 is an enclosure to the TA Tab see figure 4-2 on page 4-4. The RDO provides the information required to deploy the radar section and begin operations, the instructions for completing DA Form 5957 are located in table 4-1 on pages 4-5 and 4-6. Note: The DA Form 5957 RDO is a classified document once completed with mission data.