TM-9-2320-334-13&P LHST Operator, Field and Parts Manual M1147A1 Trailer Download
Page 895 of 1184
TM 9-2330-334-13&P FOUR PORT TASK VALVE REPLACEMENT - Continued 0109 00 0109 00-13/14 Blank Change 1 INSTALLATION – Continued NOTE Front and rear four port valve air hoses are installed the same way. Front four port valve air hoses shown. 13. Connect two hoses (5) to fittings (6). 14. Connect hose (3) to 90-degree fitting (4). 15. Connect four hoses (1) to two tee fittings (2). END OF WORK PACKAGE