TM-9-2320-334-13&P LHST Operator, Field and Parts Manual M1147A1 Trailer Download

Page 86 of 1184

TM 9-2330-334-13&P RAIL ASSEMBLY OPERATION - CONTINUED 0005 00 0005 00-6 LOWERING RAIL OPERATION - Continued 7. Install flatrack locking pin (2) in trailer (3). 8. Install retaining pin (1) in flatrack locking pin (2). 9. Perform previous three steps on RH flatrack locking pin, outer stowage pin and DIN locking plate. END OF WORK PACKAGE