TM-9-2320-334-13&P LHST Operator, Field and Parts Manual M1147A1 Trailer Download

Page 810 of 1184

TM 9-2330-334-13&P SHUTTLE AND GUIDE BRACKET REPLACEMENT - Continued 0100 00 0100 00-10 INSTALLATION - Continued 9. Install four retaining rings (18) on roller pins (15). 10. Align roller pin (15) with service hole (16) on rail (17). 11. Install four grease fittings (21) in roller pins (15). WARNING Shuttle weighs approximately 550 lbs (250 kgs). Attach a suitable lifting device prior to installation. Failure to comply may result in serious injury to personnel or damage to equipment. NOTE LH and RH front and rear roller pins are installed the same way. Front LH roller pin is shown. Install front two roller pins prior to rear for ease of installation. 12. Push roller pin (15) through roller (20) and shuttle (6). 13. Perform previous step on remaining roller pins.