TM-9-2320-334-13&P LHST Operator, Field and Parts Manual M1147A1 Trailer Download

Page 607 of 1184

TM 9-2330-334-13&P AIR BRAKE ARM REPLACEMENT 0076 00 0076 00-1 Change 1 THIS WORK PACKAGE COVERS: Removal, Installation, Operational Checks INITIAL SETUP: Maintenance Level Field Tools and Special Tools Tool Kit, Genl Mech (Item 24, WP 0167 00) Goggles, Industrial (Item 8, WP 0167 00) Materials/Parts Seal, Grease (2) (Item 51, WP 0168 00) Washer, Lock (4) (Item 6, WP 0168 00) Equipment Conditions Trailer uncoupled (WP 0043 24, TM 2320- 392-10-1) Air brake chamber removed (WP 0081 00) Wheel hub removed (WP 0085 00) GENERAL This work package contains information and instructions to replace the Load Handling System Trailer (LHST) air brake arm. WARNING Wear appropriate eye protection when working under trailer due to the possibility of falling debris. Failure to comply may result in injury to personnel.