TM-9-2320-334-13&P LHST Operator, Field and Parts Manual M1147A1 Trailer Download
Page 416 of 1184
TM 9-2330-334-13&P STACKING TRAILER/PREPARATION FOR TRANSPORT - Continued 0056 00 Change 1 0056 00-22 UNSTACKING-Continued 13. Rotate transport brackets (7) 180 degrees. 14. Position transport brackets (7) under rear splash guards on both top and bottom trailer. 15. Install three nuts (5) and bolts (6) in all four sets of transport brackets (7). 16. Tighten nuts (5) to 126-148 lb ft (171-201 N·m) on all transport brackets (7).