TM-9-2320-334-13&P LHST Operator, Field and Parts Manual M1147A1 Trailer Download

Page 413 of 1184

TM 9-2330-334-13&P STACKING TRAILER/PREPARATION FOR TRANSPORT - Continued 0056 00 0056 00-19 Change 1 UNSTACKING-Continued 6. Attach chains from front (20) and rear (21) lifting eyes of top trailer to overhead lifting device. 7. Lift top trailer front and rear axles (2) from transport brackets (7) on bottom trailer using overhead lifting device and place on ground.