TM-9-2320-334-13&P LHST Operator, Field and Parts Manual M1147A1 Trailer Download

Page 395 of 1184

TM 9-2330-334-13&P STACKING TRAILER/PREPARATION FOR TRANSPORT 0056 00 0056 00-1 Change 1 THIS WORK PACKAGE COVERS: Stacking Trailer, Preparation for Transport INITIAL SETUP: Maintenance Level Field Tools and Special Tools Took Kit, Genl Mech (Item 24, WP 0167 00) Wrench, Torque 50-250 lb-ft (Item 33, WP 0167 00) Materials/Parts Lockwashers (6) (Item 18, WP 0168 00) Chains (15) (NSN 4010-01-371-5772) Binder, Load (8) (NSN 3990-01-440-5975) Equipment Conditions Trailer uncoupled (TM 9-2320-392-1) Flatrack rail in down position (WP 0005 00) References TM 9-2320-392-10-1 GENERAL This work package contains information and instructions to stack and transport the Load Handling System Trailer (LHST). WARNING Wear appropriate eye protection when working under trailer due to the possibility of falling debris. Failure to comply may result in injury to personnel. CAUTION Front guides must be properly stored on both LH and RH sides of the trailer to meet with transport width requirements. Failure to comply may result in damage to equipment. Trailer must be unloaded of all containers and cargo. Failure to comply may result in damage to equipment. NOTE Lug wrench to remove stacking brackets and shuttle guide brackets included in trailer stowage box. Combine securing chains as needed to achieve desired lengths.