TM-9-2320-334-13&P LHST Operator, Field and Parts Manual M1147A1 Trailer Download
Page 34 of 1184
TM 9-2330-334-13&P Change 1 0001 00-10 GENERAL INFORMATION/WARRANTY (700,000-719,999) 001 00 WARRANTY - Continued 8. Claim Procedures (Cont). e. Disposition. The repair activity shall return defective supplies to the Contractor’s representative or ship them back at the Contractor’s expense using the replacement part carton/container. f. Invalid Warranty Claims. When supplies are inspected by the Contractor/Vendor and found to be non-warrantable, or the supplies are found to be serviceable, the repair activity submitting the claim will be required to make reimbursement for Contractor/Vendor services. Additionally, regarding Contractor/Vendor repair, the local WARCO must stipulate at the time of request for services that either non-warranty work be stopped at the time it is determined non-warrantable or be prepared to pay for completion of such work. In either case, the WARCO must be prepared to pay for diagnosis and trip charges for non-warranty service. 9. Reimbursement for Army Repair. The Contractor shall remit payment by the fifteenth (15) day of the month for all warrantable claims by the Government for reimbursement which were received by the Contractor in the previous month. Payment shall be sent to the PM, MTV, Attn: Business Management Office, with checks made payable to “The Treasurer of the United States”. In the event that the repair activity should receive any reimbursement from the Contractor, the monies must be forwarded to the PM, MTV. 10. Claim Denials/Disputes. TACOM will handle all denials or disputes. 11. Reporting. Reporting or recording action on a failed item shall be as specified in DA PAM 738-750 The Army Maintenance Management System (TAMMS). Forms that are unique to the Contractor or Repair Activity shall not be used. 12. Storage/Shipment/Handling. a. Storage. See paragraphs 2, 3.a, 3.c, 5.a and TM Care and Storage Requirements for the Trailer. b. Shipment. See paragraphs 3.a, 7.a, 7.c, 8.b, 8.c, 9.d, and 9.e. c. Handling. See paragraphs 3.a, 7.a, 7.c, 8.b, 8.c, 9.d, and 9.e. END OF WORK PACKAGE