TM-9-2320-334-13&P LHST Operator, Field and Parts Manual M1147A1 Trailer Download
Page 338 of 1184
TM 9-2330-334-13&P PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) INCLUDING LUBRICATION INSTRUCTIONS - Continued 0052 00 Change 1 0052 00-30 Weekly PMCS Procedures for Trailer - Continued Table 8. Preventive Maintenance Checks and Services (PMCS) - Weekly - Continued. ITEM NO. INTERVAL MAN- HOUR ITEM TO BE CHECKED OR SERVICED CREWMEMBER PROCEDURE EQUIPMENT NOT READY/ AVAILABLE IF: 4 Weekly Trailer Lights/ABS Diagnostic Continued. 4. Press blink code button on ABS diagnostic connector (7) once for one second and release the button. If there are no faults the LED (8) will go off, come back on and remain on. If there are faults, the LED will flash (blink). If the ABS diagnostic LED (8) flashes (blinks).