TM-9-2320-366-34-4 MTV Direct Maintenance Manual M1083 Series - Volume 4 Download
Page 64 of 796
TM 9-2320-366-34-4 18-2. M1083 PINTLE HOOK EXTENSION KIT INITIAL INSTALLATION (CONT) NOTE • Position two spacers on frame rails with beveled edges facing down. • Use bolts P/N 12414307-149 and 12414307-148 on step (42). • Left and right side of rear main crossmember support is installed the same way. Right side shown. • Route connectors and terminal lugs under rear main crossmember. (42) Position two spacers (87) and rear main crossmember support (88) on LH and RH frame rails (30 and 45) with two bolts (89 and 90) and four self-locking nuts (91). NOTE Use bolts P/N 12414307-090 on step (43). (43) Position two bolts (92) and self-locking nuts (93) on rear main crossmember support (88). NOTE Use bolts P/N 12414307-079 on step (44). (44) Position six bolts (94) and self-locking nuts (95) on rear lower crossmember support (84). (45) Remove 45-degree grease fitting (96) from support (19). (46) Install grease fitting (97) in support (19). 18-10 Change 1