TM-9-2320-366-34-4 MTV Direct Maintenance Manual M1083 Series - Volume 4 Download

Page 371 of 796

TM 9-2320-366-34-4 NOTE The value obtained in step (8) is the thickness of the new pinion shim pack to be installed. Use as many shims as required to equal value obtained in step (8). (9) If pinion cone variation number recorded in step (6) of assembly is negative, add it to value from step (7). If number is positive, subtract it from value from step (8). (10) Install bearing cone (11), bearing cup (12) and shim pack (10) on pinion drive shaft (9). (11) Install bearing cup (13) in differential carrier (14). (12) Install pinion drive shaft (9), helical gear (15) and spacer (16) in differential carrier (14). (13) Install bearing cup (13) in differential carrier (14). (14) Install bearing cone (17) on pinion drive shaft (9). (15) Position self-locking nut (18) on pinion drive shaft (9). NOTE Bearing preload of the pinion assembly must be within the following limits; new bearings 5-45 lb-in. (0.5-5 N·m), used bearings 10-30 lb-in. (1-3 N·m). Perform steps (16) through (20) if torque value is not within specifications. If torque value is within specifications go to step (21). (16) Record amount of torque required to rotate pinion drive shaft (9). (17) Remove self-locking nut (18) on pinion drive shaft (9). 24-13