TM-9-2320-366-34-4 MTV Direct Maintenance Manual M1083 Series - Volume 4 Download

Page 154 of 796

TM 9-2320-366-34-4 18-100 Change 2 18-7. DIGITIZATION KIT INITIAL INSTALLATION (CONT) (145) Position circuit breaker CB11 (173) on dashboard (174). (146) Match mark position of mounting hole locations (175) in dashboard (174). (147) Remove circuit breaker CB11 (173) from dashboard (174). (148) Drill four holes in dashboard (174) at hole locations (175). (149) Drill two holes, one inch to left and right of hole locations (175) at locations (176). (150) Install circuit breaker CB11 (173) on dashboard (174) with two screws (177). (151) Install terminal lug TL24 (178) on stud (179) with washer (180) and nut (181). (152) Install dust boot (182) on stud (179). (153) Install terminal lug TL23 (183) on stud (184) with washer (185) and nut (186). (154) Install dust boot (187) on stud (184). WARNING Wear appropriate eye protection when drilling holes. Failure to comply may result in injury to personnel.