TM-9-2320-366-34-4 MTV Direct Maintenance Manual M1083 Series - Volume 4 Download

Page 105 of 796

TM 9-2320-366-34-4 18-5. M1085 PINTLE HOOK EXTENSION KIT INITIAL INSTALLATION This task covers: a. Installation b. Follow-On Maintenance INITIAL SETUP Equipment Conditions Engine shut down (TM 9-2320-366-10-1). Tools and Special Tools Tool Kit, Genl Mech (Item 78, Appendix B) Goggles, Industrial (Item 28, Appendix B) Wrench, Torque, 0-175 lb-ft (Item 92, Appendix B) Wrench, Torque, 0-600 lb-ft (Item 97, Appendix B) Wrench Set, Socket (Item 84, Appendix B) Socket, Socket Wrench (TM 9-2320-366-20) Drill, Electric, Portable (Item 21, Appendix B) Drill Set, Twist (Item 20, Appendix B) Socket Set, Impact (Item 58, Appendix B) Vise, Machinist (Item 82, Appendix B) Tools and Special Tools (Cont) Wrench, Impact, Electric (Item 88, Appendix B) Sling, Cargo (Item 56, Appendix B) Shop Equipment, Automotive Vehicle (Item 58, Appendix B -20) Materials/Parts Ties, Cable, Plastic (Item 99, Appendix C) Dispenser, Pressure Sensitive Adhesive Tape (Item 30, Appendix C) Personnel Required (3) WARNING Wear appropriate eye protection when working under vehicle due to the possibility of falling debris. Failure to comply may result in injury to personnel. Change 1 18-51