TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download

Page 850 of 1178

TM 9-2320-366-34-3 16-582.2 Change 2 16-93. POWER TAKE-OFF (PTO) REPLACEMENT/REPAIR (CONT) e. Installation. (1) Install four threaded studs (1) in PTO (2). (1.1) Apply sealing compound to threads of 90-degree fittings (3 and 4) and tee fitting (4.1). (1.2) Install preformed packing (5) on 90-degree fitting (3). (1.3) Position 90-degree fitting (3) in PTO (2). (1.4) Install tee fitting (4.1) in PTO (2). (1.5) Install tube (5.1) on 90-degree fitting (3). (1.6) Install tube (5.1) on tee fitting (4.1). (1.7) Install preformed packing (6) on 90-degree fitting (4). (1.8) Position 90-degree fitting (4) in transmission (7). (1.9) Tighten 90-degree fittings (3 and 4) to 10-13 lb-ft (14-18 N•M). (1.10) Position gasket (8) and PTO (2) on transmission (7) with eight screws (9). (1.11) Tighten eight screws (9) to 42-50 lb-ft (57-68 N•m). WARNING NOTE Perform steps (1) through (1.11) on PTO P/N 12378814-001. Adhesive Sealant MIL-S-46163 can damage your eyes. Wear safety goggles/glasses when using; avoid contact with eyes. If sealant contacts eyes, flush with water and get immediate medical attention. Failure to comply may result in injury to personnel. NOTE Step (1.10) requires the aid of an assistant. Apply spindle compound to input gear prior to installation.