TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download
Page 850 of 1178
TM 9-2320-366-34-3 16-582.2 Change 2 16-93. POWER TAKE-OFF (PTO) REPLACEMENT/REPAIR (CONT) e. Installation. (1) Install four threaded studs (1) in PTO (2). (1.1) Apply sealing compound to threads of 90-degree fittings (3 and 4) and tee fitting (4.1). (1.2) Install preformed packing (5) on 90-degree fitting (3). (1.3) Position 90-degree fitting (3) in PTO (2). (1.4) Install tee fitting (4.1) in PTO (2). (1.5) Install tube (5.1) on 90-degree fitting (3). (1.6) Install tube (5.1) on tee fitting (4.1). (1.7) Install preformed packing (6) on 90-degree fitting (4). (1.8) Position 90-degree fitting (4) in transmission (7). (1.9) Tighten 90-degree fittings (3 and 4) to 10-13 lb-ft (14-18 N•M). (1.10) Position gasket (8) and PTO (2) on transmission (7) with eight screws (9). (1.11) Tighten eight screws (9) to 42-50 lb-ft (57-68 N•m). WARNING NOTE Perform steps (1) through (1.11) on PTO P/N 12378814-001. Adhesive Sealant MIL-S-46163 can damage your eyes. Wear safety goggles/glasses when using; avoid contact with eyes. If sealant contacts eyes, flush with water and get immediate medical attention. Failure to comply may result in injury to personnel. NOTE • Step (1.10) requires the aid of an assistant. • Apply spindle compound to input gear prior to installation.