TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download
Page 797 of 1178
TM 9-2320-366-34-3 Change 2 16-538.1/(16-538.2 Blank) b. Disassembly (1) Remove valve (1) from relief valve (2). (2) Remove fitting (3) from relief valve (2). (3) Remove preformed packing (4) from fitting (3). Discard preformed packing. (4) Remove 45-degree fitting (5) from relief valve (2). (5) Remove preformed packing (6) from 45-degree fitting (5). Discard preform packings. c. Assembly (1) Install preformed packings (1 and 2) on 45-degree fitting (3) and fitting (4). (2) Apply sealant to threads of valve (5), 45-degree fitting (3), and fitting (4). (3) Position 45-degree fitting (3) in relief valve (6). (4) Position fitting (4) in relief valve. (5) Tighten 45 degree fitting (3) and fitting (4) to 40-43 lb- ft (54-58 N•m). (6) Install valve (6) in relief valve (5). WARNING Adhesives, solvents and sealing compound can burn easily, can give off harmful vapors, and are harmful to skin and clothing. To avoid injury or death, keep away from open fire and use in a well-ventilated area. If adhesive or sealing compound gets on skin or clothing immediately with soap and water. Failure to comply may result in injury to personnel.