TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download
Page 733 of 1178
TM 9-2320-366-34-3 (19) Turn setscrew clockwise to increase pressure or counter clockwise to decrease pressure. (20) Perform step (19) until pressure is 2950-3050 psi. NOTE Hold setscrew while tightening lock nut. (21) Tighten lock nut (11) on setscrew (10). (22) Perform steps (15) through (22) as required. (23) Install cap (9) on setscrew (10). (24) Disconnect STE/ICE-R from 10,000 psi transducer (8). (25) Disconnect test hose (7) from 10,000 psi transducer (8). (26) Disconnect test hose (7) from reducer (5). (27) Remove cap (6) and reducer (5) from swivel tee (4). (28) Remove swivel tee (4) from upper main valve fitting (2). (29) Remove plug (3) from hose (1). (30) Connect hose (1) to upper main valve fitting (2). e. Follow-On Maintenance. (1) Install control panel assembly covers (TM 9-2320-366- 20-5). (2) Hydraulic reservoir supply and return valves in open position (TM 9-2320-366-10-2). (3) Service hydraulic reservoir (TM 9-2320-366-10-1). (4) Connect batteries (TM 9-2320-366-20-3). (5) Start engine (TM 9-2320-366-10-1). (6) Operate wrecker control functions and check for hydraulic leaks (TM 9-2320-366-10-1). (7) Shut down engine (TM 9-2320-366-10-1). End of Task. Change 1 16-501