TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download

Page 709 of 1178

TM 9-22320-366-34-3 Change 2 16-483 (6) Disconnect hydraulic hose (17) from flowmeter valve assembly (18). (7) Remove flowmeter valve assembly (18) from hydraulic tube (19). (8) Remove adapters (20 and 21) from flowmeter valve assembly (18). (9) Remove preformed packings (21.1) from adapters (20 and 21). Discard preformed packings. b. Installation. (1) Position preformed packings (1.1) on adapters (1 and 2). (2) Position adapters (1 and 2) on flowmeter valve assembly (3). (2.1) Tighten adapters (1 and 2) to 22-24 lb-ft (30-33 N•m). (3) Connect flowmeter valve assembly (3) to hydraulic tube (4). (4) Connect hydraulic hose (5) to flowmeter valve assembly (3).