TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download
Page 707 of 1178
TM 9-22320-366-34-3 Change 2 16-481 16-79. M1089 FLOWMETER VALVE ASSEMBLY REPLACEMENT/ADJUSTMENT This task covers a. Removal b. Installation c. Adjustment d. Follow-On Maintenance INITIAL SETUP Equipment Conditions Underlift lowered (TM 9-2320-366-10-2). Batteries disconnected (TM 9-2320-366-20-3). Hydraulic reservoir supply and return valve closed (TM 9-2320-366-10-2). Tools/Special Tools Tool Kit, Genl Mech (Item 78, Appendix B) Goggles, Industrial (Item 28, Appendix B) Tools/Special Tools (Cont) Sling, Cargo (Item 56, Appendix B) Materials/Parts Nut, Self-Locking (8) (Item 211, Appendix F) Packing, Preformed (2) (Item 237, Appendix F) Personnel Required (2) a. Removal. (1) Remove nut (1) and bracket (2) from tool box (3). (2) Remove nut (4) and towbar (5) from tool box (3). WARNING NOTE • This procedure applies to both the upper and lower flowmeter valve assemblies. The upper flowmeter valve assembly is shown. • The upper flowmeter valve assembly must be removed first. Towbar weighs approximately 150 lbs (68 kgs). Attach a suitable lifting device prior to removal. Failure to comply may result in injury to personnel or damage to equipment. NOTE Steps (2) requires the aid of two assistants.