TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download
Page 667 of 1178
TM 9-2320-366-34-3 Change 2 16-441 c. Adjustment. (1) Install tee fitting (1) on 90-degree fitting (2). (2) Install snubber (3) on tee fitting (1). (3) Install transducer (4) on snubber (3). (4) Install cable (5) to transducer (4). (5) Position hose (6) on tee fitting (1). (6) Deleted. (7) Tighten hose (6) to 35-39 lb-ft (47-53 N•m). (8) Open hydraulic reservoir supply and return valves (TM 9-2320-366-10-2). (9) Raise underlift approximately two feet (TM 9-2320- 366-10-2). (10) Verify STE/ICE-R reads 1950 psi (13445 Kpa). (11) Loosen jam nut (8) on counterbalance valve (9). (12) Operate underlift (TM 9-2320-366-10-2). (13) Adjust screw (10) until STE/ICE-R reads 1950 psi (1345 Kpa). (14) Hold adjustment screw (10) and tighten jam nut (8) on counterbalance valve (9). CAUTION NOTE Perform steps (11) through (14) if pressure reading was not 1950 psi (13445 Kpa). Steps (12) and (13) must be preformed at the same time to get a correct reading. Failure to comply may result in damage to NOTE Turn adjustment screw clockwise to increase pressure and counterclock-wise to decrease pressure.