TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download
Page 578 of 1178
TM 9-2320-366-34-3 16-342 Change 2 16-62. M1089 CRANE LOAD TEST This task covers: a. Static Overload Test b. Deleted c. Dynamic Test d. Follow-on Maintenance INITIAL SETUP Equipment Conditions Vehicle packed on hard level surface (TM 9-2320-366-10-1). Exercise all MHC functions to their full extent with REMOTE CONTROL UNIT (TM 9-2320-366-10-1). Position MHC to rear center line of vehicle (TM 9-2320-366- 10-2). Tools and Special Tools Tool Kit, Genl Mech (Item 78, Appendix B) Gloves, Welders (Item 27, Appendix B) Goggles, Industrial (Item 28, Appendix B) Materials/Parts 10000 lb weight 12100 lb weight Personnel Required (3) References TB43-0142 WARNING • When loads are applied to boom cable all personnel must move to a safe distance. Failure to comply may result in injury to personnel. • Wear appropriate eye protection when working under vehicle due to the possibility of falling debris. Failure to comply may result in injury to personnel. • Wire rope can become frayed or contain broken wires, wear heavy leather palmed work gloves when handling wire rope. Failure to comply may result in injury to personnel. NOTE Load testing shall be performed from crane local control panel.