TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download
Page 513 of 1178
TM 9-2320-366-34-3 (2) Install overload shutdown (7) and ground strap (2) on boom assembly (3) with washer (8), lockwasher (9), and bolt (10). (3) Install washer (11), lockwasher (12) and bolt (13) in overload shutdown (7). NOTE Step (4) requires the aid of an assistant. (4) Install two clipnuts (14), washers (15), lockwashers (16), and bolts (17) in overload shutdown (7). (5) Connect three connectors (18) to overload shutdown (7). (6) Connect cable eye (19) to bolt (20). c. Follow-On Maintenance. (1) Connect batteries (TM 9-2320-366-20-3). (2) Perform crane load test (para 16-62). End of Task. 16-277