TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download

Page 501 of 1178

TM 2320-366-34-3 Change 2 16-265 (10) Install two preformed packings (12) on 45-degree fittings (2). (11) Connect two hoses (13) to 45-degree fittings (2). (12) Install preformed packing (14) on check valve (5). (13) Connect hose (15) to check valve (5). c. Follow-On Maintenance. (1) Install hook assembly (TM 9-2320-366-20-5). (2) Install hoist hydraulic motor (para 16-49). (3) Perform crane load test (para 16-62). End of Task.