TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download
Page 483 of 1178
TM 9-2320-366-34-3 16-46. M1089 TENSION LOAD CELL REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Boom positioned over tool boxes (TM 9-2320-366-10- 2). Batteries disconnected (TM 9-2320-366-20-3). Tools and Special Tools Tool Kit, Genl Mech (Item 78, Appendix B) Bar, Wrecking (Item 6, Appendix B) Sling, Cargo (Item 56, Appendix B) Materials/Parts Cap and Plug Set (Item 17, Appendix C) Materials/Parts (Cont) Packing, Preformed (2) (Item 231, Appendix F) Packing, Preformed (Item 261, Appendix F) Sealing Compound (Item 76, Appendix C) Ties, Cable Plastic (Item 92, Appendix C) Lockwasher (Item 138, Appendix F) Dispenser, Pressure Sensitive Adhesive Tape (Item 30, Appendix C) Personnel Required (2) a. Removal. NOTE · Tag electrical connectors and connection points prior to disconnecting. · Remove plastic cable ties as required. (1) Disconnect tension load cell connector (1) from overload shutdown box (2). (2) Disconnect proximity sensor connector (3) from overload shutdown box (2). 16-247