TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download
Page 456 of 1178
TM 9-2320-366-34-3 16-39. M1089 TENSION LINK CYLINDER REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Position boom on boom rest (TM 9-2320-366-10- 2). Engine shut down (TM 9-2320-366-10-1). Tools and Special Tools Tool Kit, Genl Mech (Item 78, Appendix B) Wrench, Torque, 0-600 lb-ft (Item 97, Appendix B) Tools and Special Tools (Cont) Wrench Set, Socket (Item 84, Appendix B) Materials/Parts Sealing Compound (Item 76, Appendix C) Personnel Required (2) a. Removal. NOTE Left and right side tension link cylinders are removed the same way. Right side shown. (1) Remove two screws (1), washers (2), and bushings (3) from rivet eyebolts (4). (2) Remove two rivet eyebolts (4) from pivot shaft (5). NOTE · Steps (3) through (9) require the aid of an assistant. · Drive out pivot shaft far enough to free tension link cylinder. (3) Drive pivot shaft (5) out of tension link cylinder (6). (4) Position tension link cylinder (6) on tool box (7). 16-220