TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download

Page 452 of 1178

TM 9-2320-366-34-3 16-38. M1089 ERECTION CYLINDER REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Position boom on boom rest (TM 9-2320-366-10- 2). Hydraulic reservoir supply valve and return valve closed (TM 9-2320-366-10-2) Tools and Special Tools Tool Kit, Genl Mech (Item 78, Appendix B) Wrench Set, Socket (Item 84, Appendix B) Pan, Drain (Item 43, Appendix B) Tools and Special Tools (Cont) Wrench, Torque, 0-600 lb-ft (Item 97, Appendix B) Materials/Parts Cap and Plug Set (Item 17, Appendix C) Sealing Compound (Item 76, Appendix C) Dispenser, Pressure Sensitive Adhesive Tape (Item 30, Appendix C) Personnel Required (2) a. Removal. (1) Remove two screws (1), washers (2), and bushings (3) from rivet eyebolts (4). (2) Remove two rivet eyebolts (4) from pivot shaft (5). WARNING Remove pivot shaft enough to release tension link cylinder and erection cylinder. Failure to comply may result in injury to personnel or damage to equipment. NOTE Step (3) requires the aid of an assistant. (3) Remove pivot shaft (5) from tension link cylinder (6). 16-216