TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download
Page 412 of 1178
TM 9-2320-366-34-3 16-32. M1089 MATERIAL HANDLING CRANE (MHC) REPLACEMENT (CONT) (9) Disconnect two tubes (16) from hand pump (17). WARNING • Material Handling Crane (MHC) weighs approximately 4575 lbs (2077 kgs). Attach a suitable lifting device prior to removal. Failure to comply may result in injury to personnel or damage to equipment. • Personnel must stand clear during lifting operations. Failure to comply may result in serious injury or death to personnel. • A guide rope must be attached to aid in controlling Material Handling Crane (MHC) during removal. Failure to comply may result in serious injury or death to personnel. (10) Remove six nuts (18), washers (19), spacers (20), washers (21), and bolts (22) from crane (23). 16-176