TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download
Page 410 of 1178
TM 9-2320-366-34-3 16-32. M1089 MATERIAL HANDLING CRANE (MHC) REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions 30K winch cables removed (TM 9-2320-366 20-5). Hydraulic reservoir supply valve and return valve closed (TM 9-2320-366-10-2). Batteries disconnected (TM 9-2320-366-20-3). Tools and Special Tools Tool Kit, Genl Mech (Item 78, Appendix B) Wrench, Torque, 0-175 lb-ft (Item 92, Appendix B) Wrench Set, Crowfoot, Ratcheting (TM 9-2320- 366-20) Multiplier, Torque Wrench (Item 42, Appendix B) Adapter, Socket Wrench (Item 3, Appendix B) Goggles, Industrial (Item 28, Appendix B) Tools and Special Tools (Cont) Pan, Drain (Item 43, Appendix B) Sling, Cargo (2) (Item 56, Appendix B) Trestle, Motor Vehicle Maintenance (4) (Item 81, Appendix B) Materials/Parts Cap and Plug Set (Item 17, Appendix C) Dispenser, Pressure Sensitive Adhesive Tape (Item 30, Appendix C) Sealing Compound (Item 76, Appendix C) Ties, Cable Plastic (Item 92, Appendix C) Personnel Required (3) WARNING Wear appropriate eye protection when working under vehicle due to the possibility of falling debris. Failure to comply may result in injury to personnel. a. Removal. NOTE · Tag electrical connectors and connection points prior to disconnecting. · Remove plastic cable ties as required. (1) Disconnect 13 electrical connectors (1) from eight bank control panel (2). (2) Disconnect connector (3) from main control panel (4). 16-174