TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download
Page 383 of 1178
TM 9-2320-366-34-3 NOTE Step (7) requires the aid of two assistant. (7) Remove four bolts (16), lockwashers (17) and valve manifold assembly (7) from crane control panel (5). Discard lockwashers. b. Disassembly. NOTE All pilot valve bodies are disassembled the same way. Lift Control pilot valve body shown. (1) Remove four bolts (1) and pilot valve body (2) from valve body (3). (2) Remove three preformed packings (4), preformed packing (5), and seal plate (6) from pilot valve body (2). Discard preformed packings. (3) Loosen eight screws (7) on two solenoids (8). (4) Remove two solenoids (8) from pilot valve body (2). (5) Remove two preformed packings (9) and spool (10) from pilot valve body (2). 16-147