TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download

Page 327 of 1178

TM 9-2320-366-34-3 b. Installation. (1) Install preformed packing (1) on holding valve (2). (2) Install two preformed packing (3) on holding valve (2). (3) Install three preformed packing (4) on holding valve (2). (4) Install holding valve (2) in motor control valve (5). c. Follow-On Maintenance. Perform crane load test (para 16-31). End of Task. 16-91