TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download
Page 307 of 1178
TM 9-2320-366-34-3 (9) Install two preformed packings (14) on fittings (15). (10) Connect two hydraulic hoses (16) to fittings (15). (11) Install bracket (17) on hoist assembly (1) with two washers (18) and screws (19). (12) Install preformed packing (20) on check valve (21). (13) Connect hydraulic hose (22) to check valve (21). c. Follow-On Maintenance. (1) Install hoist cable (TM 9-2320-366-20-5). (2) Perform crane load test (para 16-31). End of Task. 16-71