TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download
Page 295 of 1178
TM 9-2320-366-34-3 (11) Install two preformed packings (13) on fittings (14). (12) Install two preformed packings (15) on fittings (16). (13) Connect hoses (17 through 20) to counterbalance valve (21). c. Follow-On Maintenance. (1) Install boom assembly (para 16-3). (2) Check fluid level in hydraulic reservoir. Refill as required (TM 9-2320-366-20). (3) Perform crane load test (para 16-31). End of Task. 16-59