TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download

Page 284 of 1178

TM 9-2320-366-34-3 16-8. M1084/M1086 ERECTION CYLINDER REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions MHC erected with end of boom lowered in cargo bed (TM 9-2320-366-10-1). Engine shut down (TM 9-2320-366-10-1). Tools and Special Tools Tool Kit, Genl Mech (Item 78, Appendix B) Wrench, Torque, 0-600 lb-ft (Item 97, Appendix B) Wrench Set, Socket (Item 84, Appendix B) Sling, Cargo (Item 56, Appendix B) Materials/Parts Cap and Plug Set (Item 17, Appendix C) Sealing Compound (Item 76, Appendix C) Grease, Automotive and Artillery (Item 35, Appendix C) Packing, Preformed (2) (Item 235, Appendix F) Packing, Preformed (2) (Item 261, Appendix F) Dispenser, Pressure Sensitive Adhesive Tape (Item 30, Appendix C) Personnel Required (2) a. Removal. CAUTION Cap or plug hydraulic openings to prevent contamination of hydraulic system. Failure to comply may result in damage to equipment. NOTE Tag hydraulic hoses and connection points prior to disconnecting. (1) Disconnect two hydraulic hoses (1) from 90-degree fittings (2 and 3). 16-48