TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download
Page 255 of 1178
TM 9-2320-366-34-3 16-4. M1084/M1086 BOOM FLY SECTION REPLACEMENT/ADJUSTMENT This task covers: a. Removal b. Cleaning/Inspection c. Installation d. Adjustment e. Follow-On Maintenance INITIAL SETUP Equipment Conditions Boom positioned level over cargo bed with boom mid section fully extended and boom fly section partially extended (TM 9-2320-366-10-1). Batteries disconnected (TM 9-2320-366-20-3). Hook block assembly removed (TM 9-2320-366-20-5). Boom sheave removed (TM 9-2320-366-20-5). Tools and Special Tools Tool Kit, Genl Mech (Item 78, Appendix B) Sling, Cargo (Item 56, Appendix B) Goggles, Industrial (Item 28, Appendix B) Wrench, Torque, 0-175 lb-ft (Item 92, Appendix B) Tools and Special Tools (Cont) Caliper Set, Micrometer, Outside (Item 9, Appendix B) Materials/Parts Rag, Wiping (Item 60, Appendix C) Solvent, Dry Cleaning (Item 83, Appendix C) Grease, Ord, Extreme Pressure (Item 38, Appendix C) Pin, Cotter (4) (Item 324, Appendix F) Sealing Compound (Item 76, Appendix C) Rope, Fibrous (Item 62, Appendix C) Personnel Required (2) a. Removal. CAUTION Overload shutdown cable is on a tension reel. Allow cable to rewind slowly. Failure to comply may result in damage to equipment. (1) Remove overload shutdown cable eye (1) from screw (2). 16-19