TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download
Page 254 of 1178
TM 9-2320-366-34-3 16-3. M1084/M1086 BOOM ASSEMBLY REPLACEMENT (CONT) (22) Route overload lockout connector (24) over top of tension link cylinder (5) and RH lift cylinder (10). (23) Route hydraulic hose (25) over top of tension link cylinder (5) and RH lift cylinder (10). NOTE Install plastic cable ties and cable clamps as required. (24) Connect overload lockout connector (24) to top connection on overload shutdown box (26). (25) Connect hydraulic hose (25) on right side of boom assembly (1). c. Follow-on Maintenance. (1) Connect batteries (TM 9-2320-366-20-3). (2) Install hoist cable (TM 9-2320-366-20-5) (3) Lubricate MHC (TM 9-2320-366-20). (4) Perform crane load test (para 16-31). End of Task. 16-18