TM 9-2320-366-34-3  16-3. M1084/M1086 BOOM ASSEMBLY REPLACEMENT (CONT)  (22) Route overload lockout connector (24) over top of  tension link cylinder (5) and RH lift cylinder (10).  (23) Route hydraulic hose (25) over top of tension link  cylinder (5) and RH lift cylinder (10).  NOTE  Install plastic cable ties and cable clamps as  required.  (24) Connect overload lockout connector (24) to top  connection on overload shutdown box (26).  (25) Connect hydraulic hose (25) on right side of boom  assembly (1).  c. Follow-on Maintenance.  (1) Connect batteries (TM 9-2320-366-20-3).  (2) Install hoist cable (TM 9-2320-366-20-5)  (3) Lubricate MHC (TM 9-2320-366-20).  (4) Perform crane load test (para 16-31).  End of Task.  16-18