TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download
Page 246 of 1178
TM 9-2320-366-34-3 16-3. M1084/M1086 BOOM ASSEMBLY REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions MHC erected over cargo bed with boom fully retracted (TM 9-2320-366-10-1). Hoist cable removed (TM 9-2320-366-20-5). Batteries disconnected (TM 9-2320-366-20-3). Tools and Special Tools Tool Kit, Genl Mech (Item 78, Appendix B) Sling, Cargo (Item 56, Appendix B) Wrench, Torque, 0-600 lb-ft (Item 97, Appendix B) Wrench Set, Socket (Item 84, Appendix B) Materials/Parts Cap and Plug Set (Item 17, Appendix C) Sealing Compound (Item 76, Appendix C) Grease, Automotive and Artillery (Item 35, Appendix C) Ties, Cable Plastic (Item 92, Appendix C) Dispenser, Pressure Sensitive Adhesive Tape (Item 30, Appendix C) Personnel Required (2) a. Removal. (1) Disconnect overload lockout connector (1) from overload shutdown box (2). CAUTION Cap or plug hydraulic hoses and fittings to prevent contamination of hydraulic system. Failure to comply may result in damage to equipment. NOTE • Remove plastic cable ties and cable clamps as required. • Tag hydraulic hoses and connection points prior to disconnecting. (2) Pull overload lockout connector (1) clear of boom assembly (3). (3) Disconnect hydraulic hose (4) from boom assembly (3). (4) Pull hydraulic hose (4) clear of boom assembly (3). 16-10