TM-9-2320-366-34-3 MTV Direct Maintenance Manual M1083 Series - Volume 3 Download
Page 157 of 1178
TM 9-2320-366-34-3 (91) Install power distribution panel (113) in dashboard (108) with three washers (128) and screws (129). (92) Install three screws (130) in power distribution panel (113). e. Follow-On Maintenance. (1) Install kick panel (TM 9-2320-366-20-4). (2) Install instrument panel (TM 9-2320-366-20-3). (3) Install steering wheel (TM 9-2320-366-20-4). (4) Fill radiator with anti-freeze (TM 9-2320-366-10). (5) Connect batteries (TM 9-2320-366-20-3). (6) Start engine (TM 9-2320-366-10-1). (7) Check air system and heater hoses for leaks (TM 9- 2320-366-10-1). (8) Operate vehicle and electrical system and check for proper operation (TM 9-2320-366-10-1). (9) Shut down engine (TM 9-2320-366-10-1). End of Task. 15-89