TM-9-2320-366-34-2 MTV Direct Maintenance Manual M1083 Series - Volume 2 Download
Page 992 of 1434
TM 9-2320-366-34-2  13-332 Change 2  13-33. M1083 SUBFRAME RAIL REPLACEMENT  This task covers:  a. Removal  b. Installation  c. Follow-On Maintenance  INITIAL SETUP  Equipment Conditions  Cargo bed removed (para 15-9).  Fuel tank removed (TM 9-2320-366-20-3).  Tool box removed (TM 9-2320-366-20-4).  Hydraulic manifold removed (TM 9-2320-366-20-5).  Hydraulic reservoir removed, if equipped (TM 9-  2320-366-20-5).  Transmission auxiliary oil cooler removed (TM 9-  2320-366-20-4).  Tools and Special Tools  Tool Kit, Genl Mech (Item 78, Appendix B)  Goggles, Industrial (Item 28, Appendix B)  Wrench, Torque, 0-600 lb-ft (Item 97, Appendix B)  Socket Set, Impact (Item 58, Appendix B)  Wrench, Impact, Electric (Item 88, Appendix B)  Wrench Set, Socket (Item 84, Appendix B)  Materials/Parts  Nut, Self-locking (17) (Item 211, Appendix F)  Bolt (17) (Item 7, Appendix F)  Personnel  (3)  a. Removal.  (1) Remove two collars (1) and bolts (2) from front  lifting bracket (3). Discard collars and bolts.  WARNING  CAUTION  Wear appropriate eye protection when  working under vehicle due to the  possibility of falling debris. Failure to  comply may result in injury to personnel.  When removing bolts, continuous removal of  collars is mandatory. Failure to comply may  result in seizing of collar to bolt.  NOTE  • Left and right side subframe rails are  removed the same way. Right side  shown.  • Steps (1) through (4) require the aid of  an assistant.