TM-9-2320-366-34-2 MTV Direct Maintenance Manual M1083 Series - Volume 2 Download
Page 876 of 1434
TM 9-2320-366-34-2 13-25. M1093 FRAME RAIL REPLACEMENT (CONT) (17) Position three clamps (25) on frame rail (1) with three bolts (26) and self-locking nuts (27). (18) Tighten three self-locking nuts (27) to 84-108 lb-in. (10- 12 N·m). (19) Position six clamps (28) on frame rail (1) with six bolts (29) and self-locking nuts (30). (20) Tighten six self-locking nuts (30) to 84-108 lb-in. (10-12 N·m). c. RH Removal. (1) Remove four self-locking nuts (1), bolts (2), and five clamps (3) from frame rail (4). Discard self-locking nuts. CAUTION When removing bolts, continuous removal of collars is mandatory. Failure to comply will result in seizing of collar to bolt. NOTE Steps (2) through (7) require the aid of an assistant. (2) Remove collar (5), bolt (6), and frame plate (7) from frame rail (4). Discard collar and bolt. (3) Remove three collars (8), bolts (9), and frame plate (10) from frame rail (4). Discard collars and bolts. 13-216