TM-9-2320-366-34-2 MTV Direct Maintenance Manual M1083 Series - Volume 2 Download

Page 396 of 1434

TM 9-2320-366-34-2 7-6. TRANSMISSION RESILIENT MOUNT AND BRACKET REPLACEMENT (CONT) (9) Remove two bolts (19) and resilient mount (20) from bracket (18). b. LH Installation. (1) Position resilient mount (1) on bracket (2) with two bolts (3). (2) Tighten two bolts (3) to 76-94 lb-ft (103-127 N·m). NOTE Steps (3) through (8) require the aid of an assistant. (3) Position bracket (2) on frame rail (4) with bolt (5) and self-locking nut (6). (4) Position bolt (7) and self-locking nut (8) in frame rail (4). (5) Tighten self-locking nuts (6 and 8) to 210-225 lb-ft (285-305 N·m). 7-50