TM-9-2320-366-34-2 MTV Direct Maintenance Manual M1083 Series - Volume 2 Download

Page 196 of 1434

TM 9-2320-366-34-2 3-21. INLET MANIFOLD COVER REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Air inlet elbow removed (para 3-20). Tools and Special Tools Tool Kit, Genl Mech (Item 78, Appendix B) Wrench, Torque, 0-175 lb-ft (Item 92, Appendix B) Materials/Parts Gasket (Item 35, Appendix F) Tape, Antiseizing (Item 84, Appendix C) a. Removal. (1) Remove fitting (1) from thermostat housing (2). (2) Loosen hose clamp (3) on radiator fill hose (4). (3) Remove radiator fill hose (4) from hose adapter (5). (4) Remove hose adapter (5) from tee fitting (6). (5) Remove 14 bolts (7), washers (8), and inlet manifold cover (9) from inlet manifold (10). (6) Remove gasket (11) from inlet manifold cover (9). Discard gasket. 3-126