TM-9-2320-366-34-2 MTV Direct Maintenance Manual M1083 Series - Volume 2 Download

Page 159 of 1434

TM 9-2320-366-34-2 3-12. ROCKER ARM AND PUSH ROD REPLACEMENT/REPAIR This task covers: a. Removal b. Disassembly c. Cleaning and Inspection d. Assembly e. Installation f. Follow-On Maintenance INITIAL SETUP Equipment Conditions Valve cover removed (TM 9-2320-366-20-3). Fuel shutoff solenoid removed (para 6-4). Tools and Special Tools Tool Kit, Genl Mech (Item 78, Appendix B) Wrench, Torque, 0-175 lb-ft (Item 92, Appendix B) Socket Wrench Attachment, Screwdriver (TM 9- 2320-366-20) Adapter, Socket Wrench (Item 3, Appendix B) Tools and Special Tools (Cont) Goggles, Industrial (Item 28, Appendix B) Gloves, Rubber (Item 26, Appendix B) Materials/Parts Rag, Wiping (Item 60, Appendix C) Solvent, Dry Cleaning (Item 83, Appendix C) Lubricating Oil, Engine (Item 46, Appendix C) Dispenser, Pressure Sensitive Adhesive Tape (Item 30, Appendix C) a. Removal. NOTE • All six rocker arm groups are removed the same way. No. 1 rocker arm group shown. • No. 1 cylinder rocker arm group will have a deflector. (1) Remove four bolts (1) and deflector (2) from rocker arm group (3). CAUTION Hold rocker arm group level when removing from engine to prevent accidental disassembly. Failure to comply may result in damage to equipment. (2) Remove rocker arm group (3) from cylinder head (4). 3-89