TM 9-2320-366-34-2 13-380 Change 2 13-40. M1089 SUBFRAME RAIL REPLACEMENT (CONT) c. Follow-On Maintenance. (1) Install crane brackets (para 13-8). (2) Install tool box (TM 9-2320-366-20-4). (3) Install hydraulic manifold (TM 9-2320-366-20-5). (4) Install fuel tank (TM 9-2320-366-20-3). (5) Install wrecker control panel (TM 9-2320-366-20-5). (6) Install transmission auxiliary oil cooler and bracket (TM 9-2320-366-20-4). (7) Install underlift/stiffleg assembly (para 16-68). (8) Install tool box support structure (para 15-12). (9) Install Material Handling Crane (MHC) (para 16-32). (10) Install 30K winch (para 16-63). (11) Install crane boom rest (para 13-5). End of Task.