TM-9-2320-366-34-2 MTV Direct Maintenance Manual M1083 Series - Volume 2 Download
Page 1033 of 1434
TM 9-2320-366-34-2 CAUTION Ensure subframe rail flange is fully in contact with main frame rail flange. Failure to comply may result in damage to equipment. NOTE Steps (2) through (9) require the aid of an assistant. (2) Position 19 bolts (2) and self-locking nuts (3) in frame plate (4). (3) Tighten 19 self-locking nuts (3) to 210-225 lb-ft (285-305 N·m). (4) Position six bolts (5) and self-locking nuts (6) in two brackets (7). (5) Tighten six self-locking nuts (6) to 210-225 lb-ft (285-305 N·m). (6) Position two bolts (8) and self-locking nuts (9) in bracket (10). (7) Tighten two self-locking nuts (9) to 210-225 lb-ft (285- 305 N·m). 13-373