TM-9-2320-366-34-2 MTV Direct Maintenance Manual M1083 Series - Volume 2 Download
Page 1019 of 1434
TM 9-2320-366-34-2 Change 2 13-359 13-37. M1085 SUBFRAME RAIL REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Cargo bed removed (para 15-9). Transmission auxiliary oil cooler removed (TM 9-2320- 366-20-4). Fuel tank removed (TM 9-2320-366-20-3). Hydraulic manifold removed (TM 9-2320-366-20-5). Tool box removed (TM 9-2320-366-20-4). Hydraulic reservoir removed, if equipped (TM 9-2320-366- 20-5). Tools and Special Tools Tool Kit, Genl Mech (Item 78, Appendix B) Goggles, Industrial (Item 28, Appendix B) Wrench, Torque, 0-600 lb-ft (Item 97, Appendix B) Wrench Set, Socket (Item 84, Appendix B) Wrench, Impact, Electric (Item 88, Appendix B) Socket Set, Impact (Item 58, Appendix B) Materials/Parts Nut, Self-locking (23) (Item 211, Appendix F) Bolt (23) (Item 7, Appendix F) Personnel (3) a. Removal. (1) Remove two collars (1) and bolts (2) from front lifting bracket (3). Discard collars and bolts. WARNING CAUTION Wear appropriate eye protection when working under vehicle due to the possibility of falling debris. Failure to comply may result in injury to personnel. When removing bolts, continuous removal of collars is mandatory. Failure to comply will result in seizing of collar to bolt. NOTE • Left and right side subframe rails are removed the same way. Right side shown. • Steps (1) through (5) require the aid of an assistant.