TM-9-2320-366-34-1 MTV Direct Maintenance Manual M1083 Series - Volume 1 Download
Page 948 of 1591
TM 9-2320-366-34-1 Change 1 2-803 CONTINUITY TEST (1) Remove control valve module (para 7-10). (2) Remove four screws and cover from control valve module. (3) Disconnect internal wiring harness connector F from F solenoid. (4) Set multimeter to ohms. (5) Connect positive (+) probe of multimeter to internal wiring harness24-pin connector pin D3. (6) Connect negative (-) probe of multimeter to internal wiring harness connector F pin A and note reading on multimeter. (7) If continuity is not present, replace transmission internal wiring harness (para 7-13). (8) Connect positive (+) probe of multimeter to internal wiring harness 24-pin connector pin D3. (9) Connect negative (-) probe of multimeter to all other pins in internal wiring harness 24-pin connector and note reading on multimeter. (10) Connect negative (-) probe of multimeter to ground and note reading on multimeter. (11) If continuity is present, transmission internal wiring harness is shorted; replace transmission internal wiring harness (para 7-13).