TM-9-2320-366-34-1 MTV Direct Maintenance Manual M1083 Series - Volume 1 Download

Page 294 of 1591

Change 1 2-157 TM 9-2320-366-34-1 CONTINUITY TEST (1) Set multimeter to ohms. (2) Connect positive (+) probe of multimeter to internal wiring harness 31-pin connector pin X. (3) Connect negative (-) probe of multimeter to internal wiring harness connector C3 pin 3A and note reading on multimeter. (4) If continuity is not present, replace transmission internal wiring harness (para 7-13). (5) Connect positive (+) probe of multimeter to internal wiring harness 31-pin connector pin X. (6) Connect negative (-) probe of multimeter to all other pins in internal wiring harness 31-pin connector and note reading on multimeter. (7) Connect negative (-) probe of multimeter to ground and note reading on multimeter. (8) If continuity is present, transmission internal wiring harness is shorted; replace transmission internal wiring harness (para 7-13). (9) If continuity was present in step (3) and absent in steps (6) and (7), replace C3 pressure switch (para 7-8). (10) Connect internal wiring harness connector C3 to C3 pressure switch connector. (11) Install control valve module (para 7-10). (12) Connect batteries (TM 9-2320-366-20-3).